Physical Simulation for Physical Engineering
A design isn’t finished just because it can be built. Rather, it becomes deployable when there is sufficient evidence it will work as intended, under expected operating constraints. Simulation is how engineers get that evidence before anything is made, but most designs demand more than one form. Clamping, vibration, flow, motion analysis might seem like four separate concerns, but in reality they each answer part of one question. Will this design do what it promises to?
Today, gathering that evidence fractures the design workflow. A part can be designed in one application, meshed and analyzed in a second suite, and checked against the system around it in a third. The results travel back by hand, often as handoffs which imperfectly document design context.
The weakest link in this chain is the chain itself. Every transfer between software suites is a new communication barrier between engineers, another chance to analyze the wrong revision, drop a boundary condition, or miss a consequence that only appears when two studies are read together. Working through so many different tools is not only slow, it is a source of critical execution risk.





End-to-end engineering depends on physical insight, which comes from amalgamating many distinct analyses into one account of how a design behaves.a That is why Quartz is our singular product. We built it as an environment where models learn and work in CAD, which simulation then extends into an investigative toolset for a given design’s behavior. In Quartz, an agent can run several high-fidelity models in parallel and reason across them in the context of its features and constraints upstream, and its end use downstream. For an engineer, this means any design change stays together with the evidence that justifies it. Comprehensiveness like this is also key to training a CAD model which is intuitively aware of the implicit requirements of any given design and its interactions with the world around it.
In this post, we walk through three case studies in Quartz which demonstrate what fast, parallel physics checks make possible. Every redesign and study within these examples was started from a plain-language request typed into Quartz, not set up by hand through menus in separate tools. In each, an agent reviews a design in the context of an engineering requirement, runs the studies it needs in the same environment, and carries what each individual study finds into downstream decisions. Workholding shows an agent weighing several physical requirements at once, piping shows it connecting analyses across scales, and the workcell shows it trading productivity against physical constraints. Each is the kind of task teams can train and evaluate agents on.
Simulations are not reasons
It’s worth noting that while a simulation result can report how CAD behaves under given conditions, it does not on its own tell us whether the design meets its requirements. Turning one into the other is the core of engineering work and involves judging whether the behavior is physically plausible, knowing what the model assumes and where it stops holding, and deciding what the evidence supports. Does a given fixture stay within its positional tolerance? Do the system model and the local high-fidelity flow model agree? Disagreement raises further questions the analysis should cover before any changes are suggested.
This is already hard for engineers and has significant implications for what their teams can achieve. Running analyses and reading results takes attention across tools, disciplines, and org charts. That expended effort then limits the number of improvements a design organization has the resources to evaluate. As agents produce more design candidates, validating each one cannot take a proportionate amount of human feedback. Agents must be expected to carry an investigation from the specified requirements to a supported set of conclusions, and use them to converge on a reasonable result quickly.
Physical understanding is the filter which makes that convergence possible. An agent that runs simulations without that judgment produces a flood of numbers while deriving few meaningful conclusions. In each case study that follows, the agent has to dig deeper. What does a result mean in the context of a set of requirements? Does it imply we should change the design, or refine the analysis? Is more information required?
New workpiece, boss stays within 0.05 mm, no slippage
The flat jaws lose contact under the cut

Pocket the soft jaws, shaping each to the flange so it grips along its contour

Finds the clamped setup’s natural frequencies and checks the cutter never excites them

Solves how hard the jaws press on the flange while the cut shakes it, and whether the flange slips
Accept the pocketing, the boss holds within 0.05 mm up to about 10,900 rpm
Higher demand, 16 Nm³/min while remaining within dryer ratings
Two trains run each dryer at 114% of its rating

Add a third dryer train, a copy of an existing one tied into the headers

Treats every pipe, filter and dryer as one network to find flow and pressure loss

Simulates the air inside the inlet header in 3D to see how it splits between trains
Keep the third dryer, every dryer stays within its rating, with the thinnest margin on the new train
New machining operation, accommodate an additional machine
One fixed-base robot can’t reach all six stations

Put the robot on a floor rail, with a fourth machine added in a tighter layout

Moves the robot through every station, checking reach and collisions and timing the cycle

Turns that motion into the forces and moments the robot puts into its rail and anchor bolts
Adopt the rail layout, which makes 76.9 parts per hour, with the machine doors setting the pace
Workholding: connecting high-fidelity physics
The costliest surprises in a design rarely come from any one effect on its own. Instead, they come from effects that compound. A contact that loosens slightly under load lets a part vibrate more, and the vibration loosens the contact further. Catching such effects requires analyzing detailed model outputs spanning multiple domains. A milling fixture is a small, everyday example. In this case study, its jaws have to grip a part hard enough to stay put while the cutter shakes the whole setup. Here an agent redesigns a pair of soft jaws by following the clamped state through a vibrational profile and back to the vise grip.
Quartz imports the vise and mates it so the lead screw drives both jaws together, then places the flange between them on the vise base.

The workholding check builds on the assembly as it is. Quartz solves the clamped contact first, then applies the peak cutting load to that clamped state and solves the contact again, reporting how much of the contact still grips and how far the boss moves.
With the original flat jaws, the grip does not fail outright. The slip factor is at least 10 against a target of 3.b The contact is the problem. The flat jaws touch the flange’s curved sides on small patches, about 190 to 220 mm² per jaw, and under the peak cut about two thirds of that contact lifts off, with no point left sticking. The part is held only by friction on what remains, and the boss already moves 0.047 mm sideways under the cut, against a 0.05 mm tolerance. Jaws that hold the part this way need redesigning before a vibration study is worth running.

The redesign pockets both soft jaws to the flange’s outline, its boss, flanks and lugs, as a matched pair that clears the part when the vise opens and closes onto it.
The same clamping and cutting analyses on the pocketed jaws give a different setup. The contact runs along the pocket, about 690 to 780 mm² per jaw, three to four times the area of the flat jaws, and the boss moves 0.023 mm under clamping and the peak cut, half as far as with the flat jaws. The slip factor stays at least 10.
With the static grip sufficient, Quartz runs a vibration analysis as further validation. Starting from the clamped state, it calculates the setup’s first four natural frequencies, with 2% damping, and compares them with the cutter’s tooth-passing frequencies across the speed range, which run from 500 to 1,000 Hz, plus their second and third harmonics up to 3,000 Hz.[2] It then solves the grip again under the peak cut with the vibration added, at the speed where the grip is worst, 12,000 rpm here, as a snapshot of the worst instant. The first natural frequency is 3,658 Hz, above every forcing frequency of the cut, so there are no speeds to avoid, and with vibration the slip factor is about 5.3, still above the target of 3.

The pocketed jaws hold the flange along their contour instead of on a few patches, halve the boss’s movement under the cut, and keep the setup clear of resonance. One limit remains. With vibration, the boss’s movement passes 0.05 mm above about 10,900 rpm, reaching 0.068 mm at 12,000 rpm. That result comes from a cutting load modeled as if the face mill were drilling, about 81 kN of thrust pressing the flange into the vise base, far more than a real face-milling pass. A rerun with realistic face-milling forces, from the actual depth and width of cut, would settle the top of the speed range. Until then, the redesign holds the tolerance up to about 10,900 rpm.
Piping: connecting models across scales
Engineering judgments can easily be made at the wrong physical scale. Looking at the whole system tends to blur fine-grained details into averages, and looking too closely at any one detail will lose the context that sets its conditions. Proper physical assessments should move between the two, using the big picture to frame the close-up and the close-up to test the big picture. This plant piping case study is a natural place to see such tradeoffs manifest. In it, a compressed-air system can reasonably be balanced as a network of pipes, filters and dryers, but how the air actually splits inside a single header only shows up in a detailed flow model. Here an agent moves between the two to check whether a capacity upgrade will hold.
Quartz recognizes the system from the geometry, working out which pipes, fittings, valves, filters and dryers connect to which, where air enters and leaves, and which valves form the bypasses. It builds a network model of the skid. The model represents each filter and dryer by its rated pressure drop and each fitting by an estimated loss, so flow and pressure can be solved across the whole system.
With both trains in service and 16 Nm³/min drawn from the dry receiver, the network splits the flow evenly, and each dryer carries 8 Nm³/min, 114% of its rating. The pressure tells the same story from the other side. The skid now loses 0.80 bar, against 0.30 bar at today’s 10 Nm³/min, and the plant receives 6.70 bar(g) from a 7.5 bar(g) supply. Where that pressure is lost decides the fix. If it were lost in the piping, larger pipe would recover it, but coloring the skid by pressure drop shows it is lost in the treatment equipment instead. The dryers carry the largest drops, with the filters next and the pipes and fittings far behind, so larger pipe would not help. The dryers set the limit on both counts, and the remedy is more treatment capacity.

The redesign adds a third filter-and-dryer train in parallel with the existing two, and it answers both requirements at once. Three dryers rated at 7 Nm³/min each give the skid 21 Nm³/min of treatment capacity, enough for the new 16 Nm³/min. And because the air now divides three ways instead of two, each train carries a third less flow, about 5.3 Nm³/min instead of 8. The pressure lost across a filter or dryer grows roughly with the square of the flow through it, so a third less flow should cut each train’s loss to under half, and with it most of the skid’s pressure loss. Quartz builds the new train as a copy of an existing one, with its filters, dryer, isolation valves and bypass, ties it into the inlet header at a capped stub, and into the outlet collector after rerouting the plant outlet line around it. The new train joins the same network as the two already there, so the same study can be rerun on the redesign.

The same study on the redesigned skid divides the 16 Nm³/min three ways. Each dryer now carries 5.3 Nm³/min, 76% of its rating. The total drop falls to 0.47 bar, and the plant receives 7.03 bar(g). The rerouted outlet line adds a visible share of the remaining drop, a cost of fitting the new train into the existing layout.
The result also shows what comes next. All of the air still leaves through one 2-inch outlet line, which runs at about 19 m/s at the new demand, close to the 20 m/s usually allowed for compressed-air piping. The third train resolves the dryers’ limit, and the network identifies the outlet line as the next constraint if demand keeps growing.
The network estimates each tee in the inlet header on its own, and from those estimates it splits the 16 Nm³/min evenly between the three trains. A dividing header does not always behave that way. As each branch draws off its share, the air in the header slows and its pressure recovers, and closely spaced tees affect one another. The split matters because it sets each dryer’s load.
Quartz models the air passage in the inlet header, from its inlet flange through the three branch take-offs to the first isolation valve on each branch, and runs a local high-fidelity CFD study at the operating conditions from the three-train network, with 0.345 kg/s into the header and each branch outlet held at the pressure the network solved there. To get a closed passage it first fixes two openings the redesign had left, a blind flange 5 mm off its seat on the new tie-in and an unused branch hole in the copied header pipe.

The CFD does not split the air evenly. Train 1 takes 26% of the flow, train 2 takes 35%, and the new train takes 39%, against the network’s 33% each. The pressure drop across the header itself is small, about 2 kPa to each branch, so the network’s total pressure budget holds. The split does not. If it carried through to the dryers, they would run at about 60%, 79% and 89% of their rating rather than 76% each. Every dryer would still be within its rating, but the new train would have far less margin than the network suggested.
The CFD holds each branch outlet at a fixed pressure and does not include the filters and dryers downstream, whose resistance pushes back against an uneven split. That makes the CFD split a worst case, and the real split lies between the network’s even one and the CFD’s. Even at the CFD’s split, the most loaded dryer runs at about 89% of its rating, so the third train holds at 16 Nm³/min. The local high-fidelity model confirms the redesign, and it shows that the margin is thinnest on the new train.
Workcell: connecting physical analysis to manufacturing productivity
On a factory floor, the considerations that determine maximum capacity are physical long before they are financial. It could be that an automation system cannot quite reach its station, a manipulator has to clear an obstacle, or a mount cannot take reasonable load. All of these factors can cost parts per hour in throughput in a way which is predictable well before they ever show up on an order form or balance sheet. A robotic machining cell is a compact example. Here an agent adds a machine to a cell, compares two layouts by how many parts each makes, and follows the robot’s motion into the anchors that hold it down.

Quartz adds the fourth machine as a copy of the existing ones and mounts the robot on a floor rail, a new sliding joint in the assembly made of a 5.2 m rail with anchor holes and a grooved carriage that rides its guides and carries the robot base. A motion study runs the carriage from one end stop to the other, 4.5 m of travel, without the robot or carriage hitting anything.
The same assembly supports the cycle study. Its joints drive the robot between stations, each move is checked for collisions, and the move, door, gripper and machining times are scheduled into a repeating cycle. With a double gripper, which swaps the finished part for the next one at each machine so every machine always holds a part, and 30 s per operation, the first layout produces 73.5 parts per hour, one part every 48.9 s. The robot sets the pace, and the machines are busy 61% of the time.
The timeline also shows what a layout can and cannot fix. Of the robot’s 48.9 s, doors take 24 s, the straight in-and-out moves at each station 10.8 s, the gripper 5 s, and travel along the rail only 9.1 s. Even with no travel at all, the robot would need about 40 s per part, about 90 parts per hour. A tighter layout can win back part of the travel, but faster machine doors would gain more. The gripper matters as well. Worked through from the same collision-checked move times, a single gripper gives about 55 parts per hour.
Quartz then rearranges the cell. Machines 2 and 3 turn to face the end of the rail, the rail shortens from 5.2 m to 3.05 m, and Machines 1 and 4 move 300 mm further out. The first run of this layout found two moves that swept the wrist through a machine. With the stations spaced out and the drop point on the conveyor moved, every move runs clear. The second layout produces 76.9 parts per hour, one part every 46.8 s, and the arm reaches all six stations with at least 66.6° to spare at its tightest joint.

The motion also supplies the loads the rail puts into the floor. A dynamics simulation of the full cycle on Layout B, with a 10 kg payload, follows the force and moment the arm puts into the rail at every instant. The largest come on the return move from the conveyor to the prep bench, with the carriage near the start of the rail, at about 4.0 kN into the rail and 3.4 kN·m at the carriage. The rail is treated as a rigid plate on its 12 anchor bolts.d The most loaded bolt carries about 585 N of tension, and the highest shear on any bolt over the cycle is about 200 N. An M8 class 8.8 bolt tightened to about 25 N·m meets a safety factor of 2 on every check. Slip under the shear is the tightest, and even it has several times the margin it needs. A hard stop at the far end of the rail gives a similar peak, about 4.1 kN. The rail keeps its M16 anchor holes, since in a concrete floor the anchorage, not the bolt, is usually the limit.

The result points beyond the layout. With the robot setting the pace and doors taking half of its time, faster doors, or opening each door while the robot is on its way, is the next change worth pricing. Comparing it with a fifth machine or a second robot would also need equipment and operating costs.
Putting the pieces together
Each case study ended with a decision that no single simulation could have made. The flat jaws passed a grip check and still let the boss drift to the edge of its tolerance, and the pocketed jaws, checked clamped, vibrating and under the cut, held the flange up to about 10,900 rpm. The network sized the skid’s upgrade, and the header CFD showed that the air might not split evenly, leaving the new train with the least margin. In the cell, the robot’s reach and motion set how many parts per hour each layout could make, and showed that its doors, not its travel, were the next thing to fix. In every case the answer came from reading several results together, against the requirement they were meant to test.
Outside Quartz, each of those investigations is a route through separate applications. Every arrow in Figure 18 is a point where geometry, loads or conditions are exported and re-entered by hand, and every revision sends the work back along the whole route. An agent driving those tools on an engineer’s behalf would not remove the route, only automate it. It would still have to rebuild each study from scratch and carry each result across, one hand-off at a time.












Because every requirement, candidate modification, and study live on one design state, the whole cycle from requirement to design to validation runs with full context. For an engineer, that comprehensive record indicates how the design was analyzed, under what assumptions, what each result showed, and why each subsequent change was made. For teams building in and on top of Quartz, those same threads are complete tasks with checkable outcomes, the material to train and evaluate agents on, or to build into their own products.
Keeping every study on one design state is what lets an agent pull those results into a single account of how a design behaves, and it is why Quartz is one product with one workflow rather than another set of tools to chain together. Our CSWP result showed that agents can build parts and assemble mechanisms on their own. That is necessary, but it is not yet engineering. A part that builds can still slip in its fixture, starve a dryer, or slow down a cell. Carrying a design through its physics is the next step, and the one that turns a model that can draw into one that can be trusted. The physics was never in pieces, our tools were. With Quartz, no longer.
Notes
- a“At first the phenomena of nature were roughly divided into classes, like heat, electricity, mechanics, magnetism, properties of substances, chemical phenomena, light or optics, x-rays, nuclear physics, gravitation.... However, the aim is to see complete nature as different aspects of one set of phenomena. That is the problem in basic theoretical physics, today — to find the laws behind experiment; to amalgamate these classes. Historically, we have always been able to amalgamate them, but as time goes on new things are found. We were amalgamating very well, when all of a sudden x-rays were found. Then we amalgamated some more, and mesons were found.... At any stage of the game, it always looks rather messy. A great deal is amalgamated, but there are always many wires or threads hanging out in all directions. That is the situation today….” Richard P. Feynman, The Feynman Lectures on Physics, Vol. I, §2-1.[1]
- bThe slip factor is how many times the cutting load the clamped part can carry before it slides as a whole. The study raises the load to at most 10 times the cutting load, so “at least 10” is a lower bound.
- cNm³/min is normal cubic meters per minute, the volume of air referred to normal reference conditions, typically 0 °C and 1.013 bar absolute, so that flows at different pressures can be compared.
- dTreating the rail as a rigid plate shares the load among the bolts by their positions alone. Rail flexibility, prying, fatigue and the concrete anchorage are not modeled.
References
- [1]R. P. Feynman, R. B. Leighton and M. Sands. Basic Physics. The Feynman Lectures on Physics, Vol. I, Ch. 2, 1963.
- [2]Y. Altintas. Manufacturing Automation: Metal Cutting Mechanics, Machine Tool Vibrations, and CNC Design. Cambridge University Press, 2nd ed., 2012.
- [3]U.S. Department of Energy, Advanced Manufacturing Office, and the Compressed Air Challenge. Improving Compressed Air System Performance: A Sourcebook for Industry. Third Edition, 2016.
- [4]Open Source Modelica Consortium. OpenModelica.
- [5]Crane Co. Flow of Fluids Through Valves, Fittings and Pipe. Technical Paper No. 410, 2009.
- [6]D. C. Rennels and H. M. Hudson. Pipe Flow: A Practical and Comprehensive Guide. Wiley, 2012.
- [7]OpenCFD Ltd. OpenFOAM.
- [8]FANUC America. M-20iA/35M robot specifications.